It is well known that 646-228 exam test is the hot exam of Cisco certification. Exam Code: 646-228, Exam Name: Lifecycle Services Advanced IP Communications(LSAIPC).

Here we offer a free trial part of the 646-228 exam (Including questions and answers). This will be your best 646-228 self-study training. You can check out the interface, question quality and usability of our practice exams before you decide to buy it.

If you need to buy, please visit here 646-228.

If you need to buy Cisco certification in other subjects, please visit here Cisco certification.

Free 646-228 Questions and Answers Demo

1. The staff training template is one of the templates and/or tools identified as essential for the informal
advanced training for administration and operations activity during the implement phase. What is the
other resource that is used to accomplish this activity?
A. Lessons Learned template
B. IPC Project Plan
C. Phone Deployment Kit
D. System Requirements Validation Report
E. As Built Documentation
Answer: E

2. Which template is used to define the specifics of a flash or phased implementation strategy?
A. Business Requirements Document
B. Network Implementation Plan
C. High Level Design
D. IPC Project Plan
E. Optimization Report
F. Installation Guide
Answer: B

3. In the optimize phase, the call processing assessment activity contains the establish call volume
baselining task. Which template or tool documents the call volumes?
A. Bridge Traffic Analyzer
B. Microsoft Performance and Event Monitor
C. Operational Assessment Checklist
D. Continuous Improvement Plan
E. CDR Analysis and Reporting Tool
Answer: E

4. Which two are phases of a project life cycle? (Choose two.)
A. Plan
B. Business Requirements Definition
C. Network Readiness Assessment
D. Operational Readiness Assessment
E. Design
Answer: AE

5. Within the prepare phase, which two tasks are required to begin the prepare for business requirements
workshop activity? (Choose two.)
A. Document User-Level Functionality Requirements
B. Document Vertical Business Initiatives Requirements
C. Identify key stakeholders for the Business Requirements Development Workshop
D. Conduct a Solution Value Assessment
E. Send Invitations
F. Document Corporate Business Initiatives Requirements
Answer: CE

6. During the plan phase, which template is used during the assess and document infrastructure
requirements for the proposed solution task?
A. Site Requirements Specification Document
B. IPC Project Plan
C. Staging Plan
D. Vertical Industry Snapshots
E. Operational Assessment Checklist
Answer: A

7. A good change management process incorporates consistent processes for any planned network
change. What should be included in the change management process?
A. Create the low-level design and solution design specifics.
B. Monitor announcements of upgrades and new releases.
C. Conduct detailed design business requirements gap analysis.
D. Finalize end user training strategy.
Answer: B

8. A customer requires Cisco CallManager and Cisco MeetingPlace to accomplish business and
technology goals. Which two activities must be conducted during the System Design Workshop? (Choose
two.)
A. Design Network Management and Operations Infrastructure
B. Design Agent and Supervisor Desktop Configurations
C. Design Rich Media System
D. Design Call Control System
E. Design Messaging System
Answer: CD

9. In the design phase, which task is conducted during the host physical design workshop activity?
A. Finalize Legacy Integration including Legacy Voice, Data and Active Directory
B. Develop Quality of Service Specifications
C. Design Dial Plan Architecture and Emergency Call Routing
D. Define Message Store Options and Sizing
E. Identify Network Management Design Objectives
Answer: B

10. Within the implement phase, which activity is associated with the define project visibility progress
reports and procedures task?
A. Develop Communications Plan
B. Informal Basic Training
C. Internal Kickoff Meeting
D. Informal Advanced Training for Admin and Operations Staff
E. Develop Escalation Plan
Answer: A

646-228 Study Guide More Details

Related Posts

  1. 650-059 self-study training
  2. 646-590 self-study training
  3. PK0-002 self-study training
  4. 646-363 self-study training
  5. 000-934 self-study training

Leave a Reply

Recent Posts

Links